Time Line - 201108
Carbs
Crank
Cylinders Heads
Engine Case
Engine Case tab
Pinion Gear
Pipes
Shift Selector
Trans

Spectrum Powder Coatings completed bead blasting the cylinders and heads. I polished the carbs and applied Mop & Glow to the pipes as suggested by members of the forum.

The transmission was pulled out and inspected appears to be ok and finally the crank was prepared for shipment to Dave Singleton for rebuild.

There is also a broken tab off the engine case that will be delivered to Miller Machine and Welding for repair.